Short meanings for the words that appear in notices and Awards. If a definition would need your drawings, it says so. 25 entries.
- Party wall
- In ordinary speech, the wall shared by two buildings. The Act also uses “party structure” and “party fence wall” for particular cases. Which one you have is a question for the drawing, not for a glossary.
- Party structure
- A wall, floor or other structure separating buildings, or parts of buildings, in different ownership. A floor between flats can be one.
- Party fence wall
- A wall that stands astride a boundary but is not part of a building, such as a garden wall built half on each side. It is not every timber fence.
- Building owner
- The owner who wants to do the work. It can be a freeholder, a leaseholder with the right to do that work, or a company. It is not automatically the person who rang us.
- Adjoining owner
- The owner of the land or building next door that may be affected. There can be more than one, and a freeholder and a leaseholder can both be adjoining owners.
- Notice
- A formal written notice under the Act. There are different types. A text message is not one of them.
- Consent
- A written agreement to the notice. It is not planning permission, and it does not cover a later change in the drawings unless that change is also agreed.
- Dissent
- A written refusal to agree the notice. It usually leads to surveyor appointments. It is a lawful step, not a breach of etiquette.
- Agreed surveyor
- One surveyor appointed in writing by both owners. Only where both are willing.
- Building owner’s surveyor
- The surveyor appointed by the person doing the work, where each side has their own.
- Adjoining owner’s surveyor
- The surveyor appointed by the neighbour. The neighbour chooses. This website does not choose for them.
- Third surveyor
- A surveyor selected by the two appointed surveyors to resolve things they cannot agree. Not a paid upgrade on this site.
- Award
- The document the appointed surveyor or surveyors make. It is not valid because a draft exists on a screen. It is served by them.
- Schedule of Condition
- A record of the adjoining property before work, with notes and photographs. Not a structural survey unless one was separately commissioned.
- Security for expenses
- A statutory request, in some cases, that money be set aside against risk. Not an automatic deposit on every job, and not calculated here.
- Line of junction
- The boundary line, in the context of a new wall built at or astride it.
- Adjacent excavation
- Digging within certain distances and depths of a neighbour’s building. The distances are applied to a drawing by a person.
- Section 10
- The part of the Party Wall etc. Act 1996 that deals with what happens if owners do not agree, including how surveyors are appointed and how an Award is made.
- Service
- Getting the document to the right person by a proper method, and being able to prove it.
- Counter-notice
- A notice an adjoining owner can serve in some party-structure cases, asking for extra work or a different approach. Whether one is available depends on the notice you were given. Ask a reviewer to read it.
- Special foundations
- Foundations in which an assemblage of steel is placed, as the Act uses that idea. If your engineer has designed them, say so. They change the conversation with the neighbour.
- Type A wall
- A label used by the Act’s schedule for a wall built wholly on one owner’s land. People use the phrase loosely. Check the drawing before you adopt it.
- Padstone
- The block a steel beam often sits on. If it is built into a party wall, the notice question is about that work, not about the padstone as a product.
- Notifiable work
- Work that may need a notice if the Act applies. It is not a stamp you can buy. Someone still has to match the work to the Act.
- Working hours
- On this service, weekdays 09:00–17:30. Not an emergency line.