Skip to content

Notices

The drawings changed after the notice

If the steel moves, the foundation deepens, or the extension grows towards the boundary, the notice that was served may no longer match the work.

This is general information for England and Wales. It is not a decision on your building. Status: pending project-specific review by a qualified Party Wall professional. House-style review 27 September 2026.

Tell the file before the builder

Upload the new revision and say what changed in one sentence. A reviewer decides whether a fresh notice, an amended Award, or a note to the appointed surveyor is the right path.

Do not assume the neighbour’s earlier consent covers the new scheme. Consent is to what they were shown.

Fees

Re-service and a second review are not always inside the original notice price. The pricing page says changed drawings are quoted. That is deliberate.

A Party Wall Notice does not replace planning permission, building regulations approval, leaseholder or freeholder consent, or structural advice. This platform does not provide legal advice and does not issue Awards.

Cookies

Necessary storage keeps a form you have started. Analytics stays off unless you allow it. Advertising cookies are not used in this preview.