Skip to content

Notices

Line of junction notices

A line of junction notice is about a new wall at the boundary line, not about cutting into a wall that already exists.

This is general information for England and Wales. It is not a decision on your building. Status: pending project-specific review by a qualified Party Wall professional. House-style review 27 September 2026.

Two different intentions

One version is a proposal to build a wall astride the boundary, which needs the neighbour’s agreement to place it that way. The other is notice that you intend to build a wall wholly on your own land, up to the boundary.

If they do not agree to a wall astride the line, the usual outcome is that the wall stays on your side. That is a simplification. The drawings and the exact line have to be checked.

What to send

A site plan with dimensions to the boundary is more useful than a planning elevation. If the new wall also needs foundations close to the neighbour, an excavation notice may be a second document, not a sentence inside this one.

The usual lead-in people quote is one month. Treat that as a general rule until someone has read your drawing.

A Party Wall Notice does not replace planning permission, building regulations approval, leaseholder or freeholder consent, or structural advice. This platform does not provide legal advice and does not issue Awards.

Cookies

Necessary storage keeps a form you have started. Analytics stays off unless you allow it. Advertising cookies are not used in this preview.